TEMPORARY STRUCTURES
Program | Intervention |
Dates | 2017 |
About | Faculty of Architecture/ mentor A. Planiscek |
ABOUT
The project envisages the use of a scaffolding system, otherwise ancillary structures for the construction and maintenance work on buildings.
By assembling steel pipes measuring 48 x 2.3 mm, we can design partitions, cabinets, work surfaces, pergolas or floors. We can also use glued wooden boards of standard widths of 60 cm (different lengths of 125, 200 or 250 cm) or metal, which are lighter and more stable (dim. 30x250cm), ready-made ladders, couplings, anchor rods, fences, stands.